Phase 1A

The phase of the development that comprises construction works at United open cut mine within the blue operational area identified in Figure 1 of Appendix 2. The construction works include:

• installation of erosion and sediment controls and water management infrastructure;

• establishment of a temporary mining and construction infrastructure area;

• continued operation and upgrade of the existing United infrastructure constructed under DA 410-11-2002-i;

• realignment of the Golden Highway, transmission lines and telecommunication lines;

• extraction from a borrow pit;

• construction of internal haul roads and access roads using material won on the site; and

• installation of lighting and services

The Project is currently in Phase 1A

Phase 1B The phase of the development that comprises mining operations at United open cut mine within the blue operational area identified in Figure 2 of Appendix 2
Phase 2 The phase of the development that comprises mining operations at United open cut mine and Wambo open cut mine within the blue operational area identified in Figure 3 of Appendix 2
Phase 3 The phase of the development following the cessation of mining operations that includes mine closure