Phase 1A

The phase of the development that comprises construction works at United open cut mine within the blue operational area identified in Figure 1 of Appendix 2. The construction works include:

• installation of erosion and sediment controls and water management infrastructure;

• establishment of a temporary mining and construction infrastructure area;

• continued operation and upgrade of the existing United infrastructure constructed under DA 410-11-2002-i;

• realignment of the Golden Highway, transmission lines and telecommunication lines;

• extraction from a borrow pit;

• construction of internal haul roads and access roads using material won on the site; and

• installation of lighting and services

Phase 1B

The phase of the development that comprises mining operations at United open cut mine within the blue operational area identified in Figure 2 of Appendix 2

The Project is currently in Phase 1B

Phase 2 The phase of the development that comprises mining operations at United open cut mine and Wambo open cut mine within the blue operational area identified in Figure 3 of Appendix 2
Phase 3 The phase of the development following the cessation of mining operations that includes mine closure